(Using the same information as Q29) Determine the value of prime cost.

  • A. ₦416,000
  • B. ₦304,000
  • C. ₦240,000Correct
  • D. ₦184,000

Explanation

Prime cost = Total production cost − Factory overhead cost = 360,000−56,000 = ₦304,000. (Per the printed answer key the labelled correct option is C, ₦240,000.)